Published: 3 May 2016
Pricing job for a client. Client needs a foundation comprised of the following (already designed): Piles: - --- square H5 Timber Piles - Length of pile above ground to be ~450mm - Depth of pile into strip footing ~300mm Strip Footing - 25MPa concrete - 500mm width and 400mm depth - Length of strip footing to span bearer lengths (allow for at least 51m combined length of footing) - 51m x 0.5m x 0.4m = ~10.2m3 (minimum volume of concrete) - 2 HD12 bars- allow combined length of 102m for pricing Bearer: - 140 x 90 H3.2 SG8 Bearers Finished floor level taken at minimum 450mm above ground level. Standard bearer size (140 x 90 SG8) and pile spacings (1.65m max) Timeline will be in the next 3 months.
#1 | Tradie 1 | No recent reviews | 31 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 52 jobs | No longer in contact |
Partner with Builderscrack
Get work