Published: 17 July 2017
we need someone with a small digger to dig a 2m x 2m x 1m (deep) foundation hole, line it and do a concrete pour for the secure footing of 4 steel posts that are part of a 4.5m high tower to house a large satellite dish. Will need to work alongside steel fabricator (SEL Engineering) during the erection of tower on site, co-coordinating concrete pour, etc.. Access is limited to a garden area alongside building. Must follow pre-done consulting engineers design and instructions.
#1 | Tradie 1 | No recent reviews | 0 jobs | No longer in contact |
#2 | Tradie 2 |
|
121 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 34 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 64 jobs | No longer in contact |
#5 | Tradie 5 |
|
62 jobs | No longer in contact |
Partner with Builderscrack
Get work