Published: 17 August 2015
Concrete Piling! Total Piles: 87 Pile size: 150sq Engineering summary. (refer to engineering plans/specifications for full details) Piles to bear in gravel layer minimum 7.5m deep, 500 into the gravels. A constant hammer fall of 500mm is to be maintained with a final set of 10mm/blow for the last 4 blows onto the unbroken pile head when embedded into the gravels. The hammer weight is to be 500kg. Property is located in Durham Street North. Full specifications and plans can be downloaded here: ---