Active job

Jonathan

Job description

House Piling
Christchurch

Published: 18 July 2018

Need new foundation for my old 30s bungalow. Rectangular, approximately 10.8m x 7.3m. Needs 5 rows of new piles to replace old ruined ring foundation and piles. House will have to be lifted high enough to allow either one of two options for the piles to be done: Option 1: 5 rows of 10 piles each row, 150mm poles driven 1.5m into ground, a starter hole 600mm deep could be dug to facilitate job. Poles would then be attached to existing bearers. Old foundation would need to be removed and dumped of course. Option 2: 50 shorter piles, ordinary piles 800mm bgl, embedded in 400mm cube of concrete and requisite number of anchor piles at 900mm bgl.


Trade professionals

#1 Tradie 1 Not reviewed 1 job No longer in contact
#2 Tradie 2 No recent reviews 3 jobs No longer in contact
#3 Tradie 3 No recent reviews 14 jobs No longer in contact
#4 Tradie 4 No recent reviews 5 jobs No longer in contact
#5 Tradie 5 No recent reviews 2 jobs No longer in contact
#6 Tradie 6 No recent reviews 20 jobs No longer in contact
#7 Tradie 7 Not reviewed 0 jobs No longer in contact
#8 Tradie 8 No recent reviews 51 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo