My property has had EQC work done and completed however the foundations were not done correctly thus repairs are needed. 1. DPC needs to be put between the bearer/joist and the concrete. 2. A new 190x45 stringer to be bolted to the existing perimeter foundation with M12 bolts at 900mm centres and existing joists connected to the stringer with 2 screw nails. 3. Ensure flitch plate is installed both sides of bearer. 4. A 400mm long 75x75x5 galvanised steel Equal Angle is to be installed both sides of the 100mm packers and bolted into the existing perimeter foundation.