Active job

Steel Portal Frame

Job image
Job image
Job image
Job image
Job image

Job description

Structural Steelwork
Auckland

Published: 31 May 2022

Keen to get a quote for the steel fabrication and installation of the (B5) 250 PFC beams which comprise the 3 legged steel portal and the perpendicular 250 PFC beam, which intersects with the existing Steel Beam, plus SHS post as outlined in the attached Engineer Drawings. See S101. Please Note we are not looking for a quote on the following : a) 200 PFC which is part of the mid floor deck above portal frame Also if you could provide a guide around lead times for you at the moment that would be appreciated.


Trade professionals

#1 Tradie 1
31 jobs No longer in contact
#2 Tradie 2 Not reviewed 0 jobs No longer in contact
#3 Tradie 3
6 jobs No longer in contact
#4 Tradie 4
221 jobs No longer in contact
#5 Tradie 5
1 job No longer in contact
#6 Tradie 6
3 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo