Posted 2 months ago
Excavation for above ground pool base
Earth-Moving
Cashmere, Christchurch
I need a base excavated for an above ground pool. The site is sloping (approx 6 deg), access is very tricky. I think the job would suit a micro excavator (1-1.5t) and a power barrow.
The area of the level pad required is 5.1m x 3.9m . I just need to excavate to hard ground, no imported fill, and there can be no cut to fill, the depth of the cut at the high side will be 700-800mm, low side will just be top soil strip.
Total volume approx 13m3. Cut material to be transported to the bottom of the...