Published: 7 November 2019
Lay fiber optic cables x 2 190 meters to 1 central point with switch each end. 1 will be for security camera hub in the middle of the camp. 1 will be for a wifi point to mesh our existing system to. 32mm tube with draw wire will be thrust into ground in conjunction with another job.
#1 | Tradie 1 |
|
10 jobs | No longer in contact |
#2 | Tradie 2 | Not reviewed | 0 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 4 jobs | No longer in contact |
Partner with Builderscrack
Get work