Published: 26 February 2015
I want to decommission an outside spa pool motor & switchboard. Electricity runs from its own meter under the house to the foundation wall then in a duct under front lawn to motor shed, about 10m (see pic for approx route). I would like the wires pulled back under the house and made safe in such a way it could be reversed if anyone wanted to in future..
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
James was very quick to respond to my post and just as quick to site visit the next morning. He listened patiently to my requirements and proposed a solution that was heaps better than my original idea, did the job the same day despite an Auckland thunderstorm and tropical downpour in the middle of it. I am very happy with the result and would certainly recommend him.
Work carried out by the owner/operator
Reviewed on 27-02-2015
Tradesperson reply
"Thank you very much Jim. I really appreciate the work and the review.
I look forward to assisting you again in the future."
Partner with Builderscrack
Get work