Review

Decommission & make safe spa pool electricity supply

Job image

Job description

General Electrical
North Shore

Published: 26 February 2015

I want to decommission an outside spa pool motor & switchboard. Electricity runs from its own meter under the house to the foundation wall then in a duct under front lawn to motor shed, about 10m (see pic for approx route). I would like the wires pulled back under the house and made safe in such a way it could be reversed if anyone wanted to in future..


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

James was very quick to respond to my post and just as quick to site visit the next morning. He listened patiently to my requirements and proposed a solution that was heaps better than my original idea, did the job the same day despite an Auckland thunderstorm and tropical downpour in the middle of it. I am very happy with the result and would certainly recommend him.

Work carried out by the owner/operator
Reviewed on 27-02-2015

Tradesperson reply
"Thank you very much Jim. I really appreciate the work and the review. I look forward to assisting you again in the future."

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo