Hi there, I have a small repair job on a switchboard in a Hood St bar premesis, a thermal imaging report has identified a fuse socket needs retermination: 'Fuse next to meter top - cable connection resistive'. Will need a note from an appropriately qualified electrician to state the repair has been completed. thanks
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Good communications for my work upgrading some switches on a commercial switchboard.
Work carried out by the owner/operator
Reviewed on 10-10-2023