We are after 3 additional power outlets for a kitchen reno. 1 is for the range hood, 1 for a new dishwasher and 1 general plug for microwave etc. House was re cabled 3 yrs ago with new switch board, rcds etc. Distance from kitchen to Switch board is approx 12m with good ceiling access or underfloor if reqd. The new kitchen arrives in approx 2-3 weeks so be good to get scope done soon and pre wire in readiness.