Published: 12 November 2017
We have a few power points that need anchoring, switches that need replacing, 3 power points that don't work and a light in the bathroom that won't work.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 14-12-2017
Partner with Builderscrack
Get work