Published: 14 May 2012
We are plumbing in a bathroom into an existing laundry and require a powerpoint to be relocated along a wall, a new powerpoint for the washing machine, and a thru wall extractor fan (client supplied) with switch to be installed. All the wall linings have been removed and some of the floorboards so access for wiring should be straightforward.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
4.0
|
Communications |
4.0
|
Work carried out by the owner/operator
Reviewed on 17-07-2012
Tradesperson reply
"Work done by employee"
Partner with Builderscrack
Get work