Published: 14 March 2016
Fit approx 10 LED down lights (replacing hanging lights) and rewire for a replacement kitchen install. The wiring is all in the same area but some power points and supply for the electric oven will need to be moved. The kitchen install is due to start on 4th April. The lighting will need to be done as soon as possible to enable painting.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Good job very good communication would recommend
Work carried out by the owner/operator
Reviewed on 26-04-2016
Tradesperson reply
"Happy to help. "
Partner with Builderscrack
Get work