Review

New kitchen

Job description

Electrical Renovations
Christchurch

Published: 14 March 2016

Fit approx 10 LED down lights (replacing hanging lights) and rewire for a replacement kitchen install. The wiring is all in the same area but some power points and supply for the electric oven will need to be moved. The kitchen install is due to start on 4th April. The lighting will need to be done as soon as possible to enable painting.


Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo