Published: 28 October 2023
We are looking for someone to lay a new exposed-aggregate front path along with some associated drainage work. This would involve: - breaking up and removing the existing concrete path, - installing 12m of grated channel drain (black polymer grating), - installing a new drainage pit next to the existing downpipe (pictured) and connecting the new channel drain to this via a pipe beneath the new concrete path, - 13.5m2 of concrete, exposed-aggregate finish.
#1 | Tradie 1 |
|
279 jobs | No longer in contact |
#2 | Tradie 2 |
|
23 jobs | No longer in contact |
#3 | Tradie 3 |
|
22 jobs | No longer in contact |
#4 | Tradie 4 |
|
3 jobs | No longer in contact |
#5 | Tradie 5 |
|
49 jobs | No longer in contact |
#6 | Tradie 6 |
|
32 jobs | No longer in contact |
#7 | Tradie 7 |
|
0 jobs | No longer in contact |
#8 | Tradie 8 |
|
4 jobs | No longer in contact |
Partner with Builderscrack
Get work