Published: 17 May 2023
Scope 1. Up-lift existing old concrete footpath and remove from site. 2. Remove soil as required for new concrete footpath depth and remove from site. 3. Pour new rf. concrete footpath together with adjacent low concrete garden retaining wall(height varies 300-900mm) Notes 1. Close proximity to road. 2. Minimal formwork required for path but formwork will be required for adjacent low garden retaining wall. 3. Architectural Plans and construction details will be provided.
#1 | Tradie 1 |
|
32 jobs | No longer in contact |
#2 | Tradie 2 |
|
3 jobs | No longer in contact |
#3 | Tradie 3 |
|
17 jobs | No longer in contact |
#4 | Tradie 4 |
|
7 jobs | No longer in contact |
Partner with Builderscrack
Get work