Published: 25 April 2023
Need a 300 x 300 x 8 mm concrete platform over existing uneven concrete. No access to concrete mixer. Have to be done on site.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work done as promised, to cost. Once payment is made, never came back to remove and take away the boxing timber. Had to get a handyman to do it.
Work carried out by the owner/operator
Reviewed on 07-06-2023
#1 | Tradie 1 |
|
4 jobs | Secured job |
#2 | Tradie 2 |
|
7 jobs | No longer in contact |
#3 | Tradie 3 | Not reviewed | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work