Published: 30 March 2022
I will prepare the area, concrete will be laid across from house foundation wall to drain channel (which I will lay) with slope to drain. Concrete either needs to be made on site or pumped. Concrete will lay over existing path. Area approx 20m2.
#1 | Tradie 1 |
|
20 jobs | No longer in contact |
Partner with Builderscrack
Get work