Published: 22 March 2022
Area Plain concrete driveway with side path 1. Dig out old current concrete to required depth and remove from site. 2. Complete preparation with 40mm basecourse all compacted. 3. Box up areas required to correct height for water control. 4. Supply Steel mesh (668) 5. Supply and set u drain length of driveway with steel grate. 6. Supply and place all concrete which will consist of 13mm structural stone 20mpa concrete. 7. Complete the surface with a broom finish. 8. Complete saw cuts were needed within 3 days of concrete work. Tradesmen advice and recommendations appreciated.