Published: 6 November 2020
- Pouring a new path (approx. 3.5m2 and 80mm to 90mm thick) - 20 MPa concrete minimum (new path to match existing path aggregate) - 12mm reo starter bars at 300 centres (approx. 18 to 20 No. ) to tie existing path into new path - Mesh laid into new path (and tied to reo starter bars) - Formwork required on one side only (new path mostly being poured up to existing path) - Separate price required to remove rubble from old path (see photos)
#1 | Tradie 1 |
|
17 jobs | No longer in contact |
Partner with Builderscrack
Get work