Active job

New Path with Reo Starters

Job image
Job image
Job image
Job image
Job image
Job image
Job image
Job image
Job image
Job image
Job image

Job description

Footpaths
Wellington

Published: 6 November 2020

- Pouring a new path (approx. 3.5m2 and 80mm to 90mm thick) - 20 MPa concrete minimum (new path to match existing path aggregate) - 12mm reo starter bars at 300 centres (approx. 18 to 20 No. ) to tie existing path into new path - Mesh laid into new path (and tied to reo starter bars) - Formwork required on one side only (new path mostly being poured up to existing path) - Separate price required to remove rubble from old path (see photos)


Trade professionals

#1 Tradie 1
17 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo