Published: 8 February 2014
We are laying a concrete floor in the basement level of a two storey house. This requires excavating up to 1.5 cubic meters of infill under floor, and laying a fully waterproofed concrete pad which will be built on top of.
#1 | Tradie 1 | No recent reviews | 1 job | No longer in contact |
#2 | Tradie 2 | No recent reviews | 4 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 7 jobs | No longer in contact |
#4 | Tradie 4 |
|
49 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 3 jobs | No longer in contact |
Partner with Builderscrack
Get work