Published: 27 April 2019
We need approximately 3 square metres of concrete about 100mm deep added to the side of an existing concrete pad as a base for a spa pool. Ideally we'd like it done in the next few weeks. The picture shows the existing concrete and a rough outline of where the new concrete is needed.
#1 | Tradie 1 | No recent reviews | 44 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 28 jobs | No longer in contact |
#3 | Tradie 3 |
|
279 jobs | No longer in contact |
Partner with Builderscrack
Get work