Published: 21 December 2018
I need to cut the concrete to replace a pipe to collect the stormwater. I need to cut 6.5 meters, so will be 2 lines with 6.5 metres each.
#1 | Tradie 1 |
|
220 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 36 jobs | No longer in contact |
#3 | Tradie 3 |
|
17 jobs | No longer in contact |
Partner with Builderscrack
Get work