Published: 30 September 2018
Our concrete patio ponds water (low point in middle ~5cm below edges). Need to fix this - was thinking to raise level by ~10cm and include drainage channel. Open to a simple driveway type finish (which we could then tile) or a mock tile finish depending on cost.
#1 | Tradie 1 | No recent reviews | 18 jobs | No longer in contact |
#2 | Tradie 2 |
|
44 jobs | No longer in contact |
Partner with Builderscrack
Get work