Published: 23 August 2018
We have a hole in our concrete floor after an old boiler was removed. The hole to fill is 750 x 750 and 450 deep. Two of the side have large holes where the pipes went that will need boarding up first before concreting. This is in a large storage cupboard but right next to the back door for easy access.
#1 | Tradie 1 |
|
279 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 29 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 120 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 67 jobs | No longer in contact |
Partner with Builderscrack
Get work