Active job

Path

Job description

Footpaths
Wellington

Published: 16 April 2018

Need concrete supplied for a sloping path of .95m3 and a concrete pad of .46 m3. They would both need the concrete pumped up about 20 metres to the areas from our lane. I can place the concrete.


Trade professionals

#1 Tradie 1 No recent reviews 23 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo