Published: 10 April 2018
Converting a small concrete path with four steps into a ramp to allow easier access to an early childhood centre. I have a plan that we have to help explain what is required. If the work was done as per the proposal in the drawing, then we would be looking at re-laying around 7m (length) of path. The resultant slope would be around 12 degrees. So, our new path of 12 degrees would be relatively steep but certainly easier with a buggy, than the steps.
#1 | Tradie 1 | No recent reviews | 5 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 16 jobs | No longer in contact |
#3 | Tradie 3 |
|
33 jobs | No longer in contact |
Partner with Builderscrack
Get work