Published: 15 March 2018
We plan to excauvate under our house bungalow, 4 br, drop the foundations down to the new level, concrete the floor, insulate and build a wall behind the excauvated area. The basement area we are looking at excauating is approximately 70-80 m2, with 40-50 m3 of fill to be removed.
#1 | Tradie 1 | No recent reviews | 23 jobs | No longer in contact |
#2 | Tradie 2 |
|
24 jobs | No longer in contact |
#3 | Tradie 3 |
|
6 jobs | No longer in contact |
#4 | Tradie 4 | Not reviewed | 0 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 6 jobs | No longer in contact |
Partner with Builderscrack
Get work