Active job

Useable basement space

Job description

New Concrete Foundations
Wellington

Published: 15 March 2018

We plan to excauvate under our house bungalow, 4 br, drop the foundations down to the new level, concrete the floor, insulate and build a wall behind the excauvated area. The basement area we are looking at excauating is approximately 70-80 m2, with 40-50 m3 of fill to be removed.


Trade professionals

#1 Tradie 1 No recent reviews 23 jobs No longer in contact
#2 Tradie 2
24 jobs No longer in contact
#3 Tradie 3
6 jobs No longer in contact
#4 Tradie 4 Not reviewed 0 jobs No longer in contact
#5 Tradie 5 No recent reviews 6 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo