Active job

Concrete cutting - first and second floors

Job description

Concrete Cutting & Drilling
Wellington

Published: 21 April 2016

I need to cut a 2.8m x 1.1m hole in 150mm thick concrete on the second floor for a staircase to be inserted. Also need to cut a 4m x 2.1m section out out of the ground floor slab at the edge, also 150mm thick. Concrete has been in place for 14 weeks.


Trade professionals

#1 Tradie 1
49 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo