Published: 26 September 2015
We have two concrete slabs that are slightly uneven and require the join between the higher slab to be ground down to match the lower one. The total length of the join is about 4m.
#1 | Tradie 1 | Not reviewed | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work