Published: 22 December 2022
Excavation and removal of all current materials to expose a clear level sub grade (including demolition of existing garage) Construction and compaction of road base. Construct drainage channel and re-lay new pipe across bottom of driveway. Supply and lay certified reinforced concrete at a depth of 100mm
#1 | Tradie 1 |
|
22 jobs | No longer in contact |
#2 | Tradie 2 |
|
22 jobs | No longer in contact |
#3 | Tradie 3 |
|
17 jobs | No longer in contact |
#4 | Tradie 4 |
|
33 jobs | No longer in contact |
Partner with Builderscrack
Get work