Published: 3 October 2021
We have a sloping driveway that is currently gravelled (90sq metres) and a walking path that is also gravelled (15sq metres). - The existing gravel will need to be excavated to form a uniform slope. - Base course will need to be applied in areas where the existing gravel is not thick enough. - The base course will need to be compacted. - At the bottom of the driveway there will need to be a plastic stormwater channel drain installed (5m long), this will connect to the drain on the right hand side. - Temporary timber boxing will need to be installed in some areas. - Concrete will need to be 100mm thick, suitable for vehicles and reinforced with steel mesh on seats. - Concrete will need a broom finish and expansion cuts made. We require someone who can provide all materials and a quality finish. We would be looking to get this done in November. Attached are photos of the driveway and walking path. The driveway will soon have a vertical sleeper wall where the trenches are on either side. This will form the edge of the driveway.
#1 | Tradie 1 |
|
61 jobs | No longer in contact |
#2 | Tradie 2 |
|
1 job | No longer in contact |
#3 | Tradie 3 |
|
67 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 9 jobs | No longer in contact |
Partner with Builderscrack
Get work