Published: 9 January 2019
We need a concrete pad in front of our double garage as well as part of the adjoining driveway replaced. The area is mostly prepped already with some areas just requiring hardfil and some boxing. Exposed aggregate would be nice. We would also like a catchment drain to run the length of the front of the garage (downpipe and stormwater drain in easy access).
#1 | Tradie 1 |
|
23 jobs | No longer in contact |
#2 | Tradie 2 |
|
17 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work