Published: 10 January 2016
We have approximately 60 sq metres of existing asphalt we want scraped and replaced with a 25-30mm new layer. The repair is only temporary so we are not looking to excavate the underlying base course although do require that the existing materials are full compacted and rolled and topped up if necessary (although this appears to be minimal)
Partner with Builderscrack
Get work