Published: 24 July 2016
Roughly 12m2 of concrete pathway, which includes a ramp at one end.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Came back at 7 30 at night to reface the concrete after rain and tarpaulins damaged the finish. Nice guy.
Work carried out by the owner/operator
Reviewed on 05-08-2016
Partner with Builderscrack
Get work