Published: 9 July 2015
Hi, The lower flat part of our 60's driveway has been eroded, and there are tomo's underneath the concrete slabs. Have also had a drain surgeon come and check the SW pipe, and this has separated causing the erosion so the old clay pipes will need to be replaced as well. One of the slabs definitely needs replacing, the other might be able to be lifted and reused. Fill is required for the void left from the erosion. Can add photo's later, would need to come and do site inspection prior to quoting I would say. Area roughly 10 x 4 mtrs. Estimated 4x6 mtr reinforced 100m, concrete slab on top, maybe another one of these if the other slap can't be lifted. Estimate 40mtrs sq fill required.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
4.0
|
Communications |
5.0
|
Norm and his guys did a great job. Would recommend Hard Road to anyone. Would get them back anytime I needed this type of work done again.
Work carried out by the owner/operator
Reviewed on 28-10-2015
Tradesperson reply
"Thanks Hamish, Valiant's rule.."
Partner with Builderscrack
Get work