Published: 24 September 2023
Replace driveway damaged by tree roots. excavation of dead roots required prior to laying new concrete. total length of driveway requiring replacement is about 5m. tree has been removed. driveway is shared and I have consent from other owner.
#1 | Tradie 1 |
|
16 jobs | No longer in contact |
#2 | Tradie 2 |
|
2 jobs | No longer in contact |
#3 | Tradie 3 |
|
159 jobs | No longer in contact |
#4 | Tradie 4 |
|
60 jobs | No longer in contact |
#5 | Tradie 5 |
|
18 jobs | No longer in contact |
#6 | Tradie 6 |
|
57 jobs | No longer in contact |
#7 | Tradie 7 |
|
1 job | No longer in contact |
#8 | Tradie 8 |
|
6 jobs | No longer in contact |
Partner with Builderscrack
Get work