Published: 22 May 2023
Site preparation, strip topsoil, saw cut small section of existing driveway and remove, box up and pour 69m2 exposed driveway and 70m2 patio, 20MPa 10mm pumped exposed aggregate with 4% black oxide, reinforced with 668 mesh. Timeframes: ready to start immediately, flexible with date for completion but preferably as soon as possible
#1 | Tradie 1 |
|
42 jobs | No longer in contact |
#2 | Tradie 2 |
|
159 jobs | No longer in contact |
#3 | Tradie 3 |
|
8 jobs | No longer in contact |
#4 | Tradie 4 |
|
0 jobs | No longer in contact |
#5 | Tradie 5 | Not reviewed | 0 jobs | No longer in contact |
#6 | Tradie 6 |
|
19 jobs | No longer in contact |
Partner with Builderscrack
Get work