Published: 22 January 2023
6 tenant driveways in a townhouse development require widening by approx 1m. Each driveway is approx 5m long, so the job will be 6 separate 5sqm x 100mm deep concrete lays. The tenant driveways are all connected by the common area body corporate main driveway with good access for trade vehicles - small digger is ok if using rubber tracks to avoid damaging the surface of this.
Partner with Builderscrack
Get work