Published: 28 September 2022
Pour exposed aggregate patio and path with 4% oxide black (likely require concrete pump) Check all client placed boxing, remove and replace approx. 17m of boxing to correct line an level, compact with plate compactor, provide and place light steel mesh, pre-pour. Site hard with no soft spots as made up with Gap 40,20 &Gap7. Pour 39m2 of 100mm thick 20mpa concrete, sawcut approx. 16m after concrete set. Want job done in October 2022. Site 20m away from driveway and approx 20m from end to end so concrete pump about 40m away from far end of job around back of house.
#1 | Tradie 1 |
|
18 jobs | No longer in contact |
#2 | Tradie 2 |
|
15 jobs | No longer in contact |
#3 | Tradie 3 |
|
121 jobs | No longer in contact |
#4 | Tradie 4 |
|
1 job | No longer in contact |
#5 | Tradie 5 |
|
2 jobs | No longer in contact |
#6 | Tradie 6 |
|
21 jobs | No longer in contact |
#7 | Tradie 7 |
|
23 jobs | No longer in contact |
#8 | Tradie 8 |
|
20 jobs | No longer in contact |
Partner with Builderscrack
Get work