Review

Container hardstand clean and repair

Job image
Job image
Job image
Job image
Job image

Job description

Concrete Crack Injection
Auckland

Published: 14 March 2022

Our MPI container hardstand does not meet MPI standards, So we need a 15sqm area water blasted and concrete sealer on cracks on the hardstand, also would like a oblong area painted in yellow


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

The guys did a great job and was approved by MPI also

Work carried out by the owner/operator
Reviewed on 06-04-2022

Verified Builderscrack review

Trade professionals

#1 Tradie 1
104 jobs Secured job
#2 Tradie 2
14 jobs No longer in contact
#3 Tradie 3
60 jobs No longer in contact
#4 Tradie 4
25 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo