Published: 19 November 2021
Concrete slab has risen above the slab in front and need to make an asphalt 'ramp' to bridge the hump. Length 3M, height 50mm
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
4.0
|
Communications |
3.0
|
Good job done.
Work carried out by the owner/operator
Reviewed on 29-12-2021
#1 | Tradie 1 |
|
39 jobs | Secured job |
Partner with Builderscrack
Get work