Published: 14 August 2021
We are wanting to replace the concrete under our carport as a tree root has ripped up the original concrete. The area is about 61sq m and gently slopes towards the driveway. I am keen to explore a drainage channel on the top side of the carport to prevent water flowing through as is currently the case. The concreting would go up to the retaining wall.
Partner with Builderscrack
Get work