Closed job

Carport concreting

Job image
Job image
Job image
Job image
Job image

Job description

Concrete Driveways & Paths
Auckland

Published: 14 August 2021

We are wanting to replace the concrete under our carport as a tree root has ripped up the original concrete. The area is about 61sq m and gently slopes towards the driveway. I am keen to explore a drainage channel on the top side of the carport to prevent water flowing through as is currently the case. The concreting would go up to the retaining wall.


Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo