Published: 29 March 2021
Old asphalt driveway to be replaced with concrete driveway. Approx 128sqm of concrete driveway with 30MPa Longburn Pebble, with 5KG/m3 black oxide. See attached plan to get an idea. Old driveway has already been removed. Probably further excavation will be required. There is resource/building consent for the work. Ready to start.
#1 | Tradie 1 |
|
69 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 174 jobs | No longer in contact |
#3 | Tradie 3 |
|
159 jobs | No longer in contact |
#4 | Tradie 4 |
|
7 jobs | No longer in contact |
#5 | Tradie 5 |
|
21 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 6 jobs | No longer in contact |
Partner with Builderscrack
Get work