Published: 10 February 2021
we require a vehicle crossing to be removed and all the concrete taken away and a new kerb placed with top soil to the area where the existing crossing extends to the footpath parts of the existing footpath are also cracked and they may as well be removed and replaced the crossing is 4 meters wide by 5 meters long ((to the edge of the footpath) PLUS i would also remove and re-concrete 1 meter of footpath both sides of the crossing the footpath is 1.5m wide so in all about 23m2 +/- of concrete to be removed a new kerb 5 meters +/- long and 3.5m by 4m of topsoil
#1 | Tradie 1 | No recent reviews | 14 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 6 jobs | No longer in contact |
#3 | Tradie 3 |
|
121 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 85 jobs | No longer in contact |
#5 | Tradie 5 |
|
229 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 14 jobs | No longer in contact |
#7 | Tradie 7 |
|
7 jobs | No longer in contact |
Partner with Builderscrack
Get work