Published: 3 February 2014
A section of lawn has been dug out to 170mm deep, 20mm of gap 7 basecourse has been put down loosely over the dug out area. Looking to pour 150mm concrete in area 2.8m wide by 7.8m long. Is approx 3.2 m3 of concrete. Site is flat with good access. Work to be done: Install 7.4 metres of boxing along one side of the area to retain the existing garden. Compact the gap 7 basecourse with vibrating compactor. Supply and lay 3.2 cubic metres of standard 17.5mpa concrete to broom finish. Cut concrete when cured if required.
#1 | Tradie 1 | No recent reviews | 70 jobs | No longer in contact |
#2 | Tradie 2 |
|
276 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 17 jobs | No longer in contact |
Partner with Builderscrack
Get work