Active job

Supply & lay 3.2m3 of concrete driveway in New Lynn

Job image

Job description

Concrete Driveways & Paths
Auckland

Published: 3 February 2014

A section of lawn has been dug out to 170mm deep, 20mm of gap 7 basecourse has been put down loosely over the dug out area. Looking to pour 150mm concrete in area 2.8m wide by 7.8m long. Is approx 3.2 m3 of concrete. Site is flat with good access. Work to be done: Install 7.4 metres of boxing along one side of the area to retain the existing garden. Compact the gap 7 basecourse with vibrating compactor. Supply and lay 3.2 cubic metres of standard 17.5mpa concrete to broom finish. Cut concrete when cured if required.


Trade professionals

#1 Tradie 1 No recent reviews 70 jobs No longer in contact
#2 Tradie 2
276 jobs No longer in contact
#3 Tradie 3 No recent reviews 17 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo