Published: 30 July 2020
We need an extra concrete pad laid in our parking area as the current pad is too small. The area is on a slight slope so some of the grass/dirt will need to be dug out before the pad is laid and the remaining grass area might need to be boxed in. No particular timeframe required. See rough markup in photo - yellow line approx area we need the extra concrete.
#1 | Tradie 1 | No recent reviews | 42 jobs | No longer in contact |
#2 | Tradie 2 |
|
24 jobs | No longer in contact |
#3 | Tradie 3 |
|
276 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 15 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 9 jobs | No longer in contact |
#6 | Tradie 6 |
|
7 jobs | No longer in contact |
#7 | Tradie 7 |
|
58 jobs | No longer in contact |
#8 | Tradie 8 |
|
21 jobs | No longer in contact |
Partner with Builderscrack
Get work