Published: 11 January 2019
Two parts of the job: 1. Cutting 200mm channel in existing concrete in 100mm thick existing drievway( about 25m long) and a 600mm deep channel for gas service line installation. Reinstatement of the concrete. You will be respnsible for succesful meeting with Vector gas and obtain sign off. 2. Ground shaping of about 80sqm driveway, about 3 truck load of cut and cartage away. Pour the drievway 100mm thick. Comprehensive contract including all earthworks, cartage, supply of concrete. 3. Immediate start, no deposit required or to be paid, payment terms 15th of February. Defects liability period of 3 months.
#1 | Tradie 1 |
|
156 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 46 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 19 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 18 jobs | No longer in contact |
#5 | Tradie 5 |
|
230 jobs | No longer in contact |
#6 | Tradie 6 |
|
121 jobs | No longer in contact |
Partner with Builderscrack
Get work