Published: 9 February 2018
I am wanting to park a caravan on the front of our property next to the drive way. I would like a quote to have a 7 metre long by 3 metre wide concrete pad laid, with a drainage gutter along 2 sides to manage run-off/drainage. I would like exposed aggregate. I would like the pad laid before 25th February.
#1 | Tradie 1 | No recent reviews | 55 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 24 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 19 jobs | No longer in contact |
Partner with Builderscrack
Get work