Published: 19 April 2017
A new concrete driveway is required to replace the existing concrete drive which is badly broken in places. Approx area is 220m2. Standard broom finish required, with reinforcing. Quote to include removal of existing drive.
#1 | Tradie 1 | No recent reviews | 8 jobs | No longer in contact |
#2 | Tradie 2 |
|
159 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 13 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 2 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 156 jobs | No longer in contact |
#6 | Tradie 6 |
|
66 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 56 jobs | No longer in contact |
Partner with Builderscrack
Get work